Amidst the fervent pursuit of green energy construction, in the scorching May weather, a water-based photovoltaic site in Guangzhou buzzed with activity, with rows of photovoltaic piles standing ready on the shore.
Due to the tough local soil, pile driving encountered significant obstacles, severely impacting the construction progress.
Facing tight deadlines and complex geological conditions, the client urgently needed an efficient and reliable solution for borehole drilling.
BeiYi: Precision Match, Immediate Response
After comparing multiple drilling rig manufacturers, the client chose BeiYi Machinery with over 20 years of manufacturing experience. Upon receiving the client's requirements, the BeiYi business team responded promptly. After careful communication, it was understood that the client required 400*9-meter photovoltaic piles, and the excavator was a CAT 336.
After careful consideration, BeiYi recommended the BY-AD65000 earth drill, complete with a bracket, power head, and drilling rods, ensuring the client had no worries.
Immediate Dispatch from Stock / Swift Response
Considering the urgency of the project, BeiYi took immediate action, reallocating the BY-AD65000 earth drill from stock and ensuring same-day delivery to the construction site to ensure the equipment arrived promptly.
Technical Support / Service
BeiYi arranged for professional technical personnel to accompany the equipment on-site, providing installation guidance and debugging services to ensure the equipment could be quickly put into operation, thus saving valuable time for the client.
Client: Efficient Earth Drill Operation, Trusted and Commended
The technical personnel skillfully modified the earth drill onto the excavator in the shortest time possible. In these complex geological conditions, the earth drill swiftly penetrated the soil with powerful thrust, reaching the required depth for construction.
With its high torque, powerful dynamics, and flexible operation, the earth drill efficiently completed the water-based photovoltaic pile drilling, making pile driving much easier!
The client expressed: This photovoltaic pile installation was completed on schedule, thanks in no small part to the earth drill. The earth drill could also be used for other borehole projects in the future. BeiYi Machinery's service this time was spot-on, and in the future, we will look to BeiYi for any mechanical needs. Trustworthy!