At the site of tube extraction, Beiyi Machinery reached a tacit cooperation agreement with China Railway Construction Corporation

At the site of tube extraction, Beiyi Machinery reached a tacit cooperation agreement with China Railway Construction Corporation.

Beiyi Machinery specializes in providing customers with one-stop construction solutions. One division of China Railway Corporation has partnered with Beiyi Machinery for a tube extraction project. On September 23rd, Beiyi Machinery arranged for technical personnel to head to the construction site.

The on-site working environment poses significant challenges:

  • Underneath an elevated structure, there are mud patches accompanied by water pools.
  • Each circular pile tube, with a diameter of approximately 63 centimeters, is immersed in muddy water.
  • These piles extend up to one meter above the ground level.
  • The technical team arrived at the site to survey the terrain and discuss construction plans.

Underneath the elevated bridge,

there are mud patches and water pools everywhere.

微信图片_20240416110211.jpg

 

微信图片_20240416110217.jpg

 

With so many deeply buried circular piles needing to be removed in their entirety, manual labor alone is not sufficient. It's imperative for Beiyi Hydraulic Pipe Extractor to step in. Our main circular tube extractor is brought to the site, and after determining the initial construction position, the technical team begins installation.

 

On-site Installation: 
The technical team skillfully installs the Beiyi Hydraulic Pipe Extractor and hydraulic station, remaining on standby in position, ready to commence work at any moment. Despite the limited construction space and uneven terrain, overcoming the complexity of the construction environment is also a necessary element for the tube extractor.

微信图片_20240416110301.jpg

With everyone working together, the Hydraulic Pipe Extractor is positioned directly above the circular pile. Upon activation, the machine clamps onto the pile and steadily lifts it from the soil, earning the admiration of onlookers and eliciting thumbs-up gestures in approval of its performance.

微信图片_20240416110332.jpg

The hydraulic station ensures safer operation. The Beiyi Hydraulic Pipe Extractor lives up to its mission, with the clamp cylinder designed to evenly distribute force around the casing perimeter, ensuring a stable extraction of the pile. When used in conjunction with the hydraulic station, which allows for remote control, construction becomes significantly safer.

 

Beiyi Hydraulic Pipe Extractor holds invention patents.

Construction is not limited by site conditions.

With a lifting force of up to 800T, it can extract piles up to 60 meters long.

Backed by Beiyi Machinery Factory's 23 years of manufacturing experience.

Quality assured, deserving of your trust.

 