Hydraulic H-Beam Pile Extractor
PILING MACHINERY
Hydraulic H-Beam Pile Extractor

 

WHATSAPP/WECHAT: +86 18115777923

EMAIL: sales@wxbychina.com

 

H-Beam pile extractor uses its clamping device to clamp the pile head, the hydraulic cylinder forces the top clamper to make it top up. Lift a distance, pull out the piles section by section, and apply to clay, sandy soil layer containing a small amount of gravel to pull the steel.

Features

  • Patent product, move fast
  • Can pull out 40 meters of steel
  • 1m/min, Pull out the big cylinder, speed up the small cylinder
  • Pulling force up To 700t
  • Patented design
  • One-piece design, overall lifting

 

[popoutContact title="Inquire Now"]

DESCRIPTION
PARAMETERS
APPLICATION
SERVICES
DOWNLOADS

PRODUCT DESCRIPTION

BeiYi H-Beam pile extractor grip the pile head with its clip and hydrauliccylinder compulsory jacked pile clamping apparatus, make it rise up acertain distance, then pull out pile hop by hop. lt is used in clay, sandor containing a small amount of gravel soil to pull out the i-beam pile orh-beam steel piles.

imgimgimg
imgimgimg
imgimgimg
imgimgimg

PRODUCT DETAILS

The following is a detailed display of our products to provide customers with high-quality products and services in the construction machinery industry.

imgimgimg
imgimgimg
imgimgimg

PARAMETER

Our product is continuously evolving, and changes due to technological reasons will not be separately notified.

ModelBY-PM320LS (Vertical)BY-PM360LS (Vertical)BY-PM380LS (Vertical)
Nominal working pressure32MPa32MPa32MPa
Rated pile drawing force500T600T700T
Max.Flow160L/min160L/min160L/min
Max. clamping force260T260T260T
H-beam specification700mm*300mm; 600mm*300mm; 500mm*300mm; 800mm*300mm;700mm*300mm; 600mm*300mm; 500mm*300mm; 800mm*300mm;700mm"300mm; 500mm*300mm

*1. Includes average mounting bracket and standard wear parts
*2. check carrier allowed attachment weight from carrier manufacturer. Check application requirements.

RICH ACCESSORIES TO       
MEET VARIOUS NEEDS

We offer a diverse range of accessories to cater to unexpected requirements.

 

[popoutContact title="Send Your Inquiry Now"]

imgimgimg

APPLICATION

BeiYi H-Beam pile extractor uses its clamping device to clamp the pile head, the hydraulic cylinder forces the top clamper to make it top up. Lift a distance, pull out the piles section by section, and apply to clay, sandy soil layer containing a small amount of gravel to pull the steel.

imgimgimg
imgimgimg
imgimgimg
imgimgimg

OUR SERVICE

If you have any questions, feel free to consult us. We offer prompt and professional service, and your satisfaction is our ultimate goal.

  • Safe and reliable: solid wood box structure ensures product safety
  • Fast delivery: standard delivery is 20 days, expedited options can be shortened to 0-7 days
  • Comprehensive support: Provide free teaching videos, professional support, 7*24 online services, including face-to-face video guidance and door-to-door after-sales service, and accessories are sufficient and easy to replace.
imgimgimg
imgimgimg
imgimgimg
imgimgimg
imgimgimg

DOOR-TO-DOOR 
INSTALLATION

Our expert team ensures a smooth installation process and we provide more than enough easily replaceable accessories for long-term reliability.

7*24 ONLINE SERVICE

7*24 online service, face-to-face video online guidance,offline door-to-door after-sales service, sufficient and easy-to-replace accessories.

What is the minimum distance between piles that allows for extraction? If the distance is insufficient, what can be done?

The minimum distance between piles for extraction is 70 cm. If this is not enough, custom solutions are available, or the piles can be staggered.

How much of the pile needs to be exposed above ground? If the length is insufficient, what can be done?

At least 20 cm of the pile should be exposed above ground. If the length is insufficient, you can weld an additional section on top.

How many piles can be extracted in a day (various lengths)?

For typical sites with 300*700 H-beams of 15-18 meters in length, 20-30 piles can be extracted per day. For piles longer than 20 meters, more extraction power is required, and the speed will be slower, allowing for about 20 piles to be extracted.

How long does it take to extract one meter of a pile?

One minute per meter.

How long does it take to extract a 20-meter 300*700 or 300*500 H-beam pile?

One minute per meter for extraction, with additional time needed for cutting holes and lifting, depending on the site conditions.

What is the stroke length of the large and small oil cylinders?

1 meter.

What is the maximum length of a pile that can be extracted, and how long does it take to extract one?

The maximum length is 38 meters, and it takes one minute per meter for extraction.

HOMECASESVIDEOS