WHATSAPP/WECHAT: +86 18115777923
EMAIL: sales@wxbychina.com
H-Beam pile extractor uses its clamping device to clamp the pile head, the hydraulic cylinder forces the top clamper to make it top up. Lift a distance, pull out the piles section by section, and apply to clay, sandy soil layer containing a small amount of gravel to pull the steel.
Features
[popoutContact title="Inquire Now"]
BeiYi H-Beam pile extractor grip the pile head with its clip and hydrauliccylinder compulsory jacked pile clamping apparatus, make it rise up acertain distance, then pull out pile hop by hop. lt is used in clay, sandor containing a small amount of gravel soil to pull out the i-beam pile orh-beam steel piles.
The following is a detailed display of our products to provide customers with high-quality products and services in the construction machinery industry.
Our product is continuously evolving, and changes due to technological reasons will not be separately notified.
Model | BY-PM320LS (Vertical) | BY-PM360LS (Vertical) | BY-PM380LS (Vertical) |
Nominal working pressure | 32MPa | 32MPa | 32MPa |
Rated pile drawing force | 500T | 600T | 700T |
Max.Flow | 160L/min | 160L/min | 160L/min |
Max. clamping force | 260T | 260T | 260T |
H-beam specification | 700mm*300mm; 600mm*300mm; 500mm*300mm; 800mm*300mm; | 700mm*300mm; 600mm*300mm; 500mm*300mm; 800mm*300mm; | 700mm"300mm; 500mm*300mm |
*1. Includes average mounting bracket and standard wear parts
*2. check carrier allowed attachment weight from carrier manufacturer. Check application requirements.
We offer a diverse range of accessories to cater to unexpected requirements.
[popoutContact title="Send Your Inquiry Now"]
BeiYi H-Beam pile extractor uses its clamping device to clamp the pile head, the hydraulic cylinder forces the top clamper to make it top up. Lift a distance, pull out the piles section by section, and apply to clay, sandy soil layer containing a small amount of gravel to pull the steel.
If you have any questions, feel free to consult us. We offer prompt and professional service, and your satisfaction is our ultimate goal.
Our expert team ensures a smooth installation process and we provide more than enough easily replaceable accessories for long-term reliability.
7*24 online service, face-to-face video online guidance,offline door-to-door after-sales service, sufficient and easy-to-replace accessories.
The minimum distance between piles for extraction is 70 cm. If this is not enough, custom solutions are available, or the piles can be staggered.
At least 20 cm of the pile should be exposed above ground. If the length is insufficient, you can weld an additional section on top.
For typical sites with 300*700 H-beams of 15-18 meters in length, 20-30 piles can be extracted per day. For piles longer than 20 meters, more extraction power is required, and the speed will be slower, allowing for about 20 piles to be extracted.
One minute per meter.
One minute per meter for extraction, with additional time needed for cutting holes and lifting, depending on the site conditions.
1 meter.
The maximum length is 38 meters, and it takes one minute per meter for extraction.
Send Inquiry to Beiyi
Please fill out the form below as thoroughly as possible to describe your requirements. Don't worry about the details, we will reply as soon as possible after submission.
EMAIL: