WHATSAPP/WECHAT: +86 18115777923
EMAIL: sales@wxbychina.com
You can easily extract H-beam steel piles using this hydraulic extractor. By clamping the pile head with the device, the hydraulic cylinder lifts the top clamper upward, allowing you to pull out the piles section by section. It performs efficiently in clay or sandy soil containing small amounts of gravel.H-Beam pile extractor uses its clamping device to clamp the pile head, the hydraulic cylinder forces the top clamper to make it top up. Lift a distance, pull out the piles section by section, and apply to clay, sandy soil layer containing a small amount of gravel to pull the steel.
Features
[popoutContact title="Inquire Now"]
Customizable for H-beams over 900 mm, this BeiYi pile extractor delivers a massive 700-ton pulling force, capable of extracting up to 40 meters of steel beams.
The following is a detailed presentation of our pile extractor, designed to provide you with high-performance pile extraction solutions and reliable service.
Our product is continuously evolving, and changes due to technological reasons will not be separately notified.
Model | BY-PM320LS (Vertical) | BY-PM360LS (Vertical) | BY-PM380LS (Vertical) | BY-PM300DS (Inverted) |
Nominal working pressure | 32MPa | 32MPa | 32MPa | 32MPa |
Rated pile drawing force | 500T | 600T | 700T | 400T |
Max.Flow | 160L/min | 160L/min | 160L/min | 160L/min |
Max. clamping force | 260T | 260T | 260T | 200T |
Jacking cylinder stroke | 1000mm | 1000mm | 1000mm | 1000mm |
Weight(Without hydraulic station) | 4800kg | 5200kg | 5600kg | 2000kg |
H-beam specification | 700mm*300mm; 600mm*300mm; 500mm*300mm; 800mm*300mm; | 700mm*300mm; 600mm*300mm; 500mm*300mm; 800mm*300mm; | 700mm*300mm; 500mm*300mm | Customized 200-400 |
*1. Includes average mounting bracket and standard wear parts
*2. check carrier allowed attachment weight from carrier manufacturer. Check application requirements.
We offer a diverse range of accessories to cater to unexpected requirements.
[popoutContact title="Send Your Inquiry Now"]
BeiYi hydraulic pile extractor is suitable for construction projects, municipal engineering, port works, and water conservancy projects. It provides an efficient and reliable solution for removing steel piles in various complex working conditions.
If you have any questions, feel free to consult us. We offer prompt and professional service, and your satisfaction is our ultimate goal.
Our expert team ensures a smooth installation process and we provide more than enough easily replaceable accessories for long-term reliability.
7*24 online service, face-to-face video online guidance,offline door-to-door after-sales service, sufficient and easy-to-replace accessories.
The minimum distance between piles for extraction is 70 cm. If this is not enough, custom solutions are available, or the piles can be staggered.
At least 20 cm of the pile should be exposed above ground. If the length is insufficient, you can weld an additional section on top.
For typical sites with 300*700 H-beams of 15-18 meters in length, 20-30 piles can be extracted per day. For piles longer than 20 meters, more extraction power is required, and the speed will be slower, allowing for about 20 piles to be extracted.
One minute per meter.
One minute per meter for extraction, with additional time needed for cutting holes and lifting, depending on the site conditions.
1 meter.
The maximum length is 38 meters, and it takes one minute per meter for extraction.
Send Inquiry to Beiyi
Please fill out the form below as thoroughly as possible to describe your requirements. Don't worry about the details, we will reply as soon as possible after submission.
EMAIL: