30-Meter H-Beams? No Problem!
How the BeiYi 360 Pile Extractor Helps You Beat Tight Deadlines
In foundation engineering, removing deeply embedded H-beams is often one of the toughest challenges on-site.
If you’re facing the same struggle — when your pile extractor “runs out of strength” and your project deadline is ticking closer — this real case might show you how we can help.
Your Challenge: The Piles Won’t Move, and the Clock Is Ticking
Not long ago, one of our clients faced almost the exact situation you might be in right now.
They needed to extract 30-meter-long H-beam piles (300×700mm) using their own 320-type pile extractor.
But things didn’t go as planned:
- Excessive resistance — the 30-meter piles were tightly bonded with the soil, and the 320 model simply didn’t have enough lifting force.
- Vibration assistance failed — even with extra vibration, the piles wouldn’t budge.
- Deadline pressure —only two weeks left before the next construction phase, and everything was stuck.
Under pressure, the client reached out to BeiYi Machinery for urgent help:
“We have 30-meter H-beams that our 320 extractor can’t pull out. Can you help us? If possible, please bring a unit for a live demo!”
Our Solution: Choosing the Right Equipment for Your Job Site
After receiving the request, our technical team immediately got in touch with the client to gather details about soil conditions, pile depth, corrosion level, and site space.
After assessment, we concluded:
“The 320 extractor’s theoretical pulling force is limited in complex ground conditions. For 30-meter piles with huge frictional resistance, you’ll need a larger, stronger, and more efficient model — the BeiYi BY-PM360LS is the perfect fit.”
The client was skeptical at first — but time was critical.
We dispatched the BY-PM360LS directly from our warehouse, and it arrived on-site the next day.
On-Site Demonstration: 15 Minutes to Extract a 30-Meter H-Beam
With guidance from our engineers, the BY-PM360LS was connected to the hydraulic power station.
Within 3 minutes, the H-beam started to move slowly upward;
after 15 minutes, the entire 30-meter H-beam was pulled out smoothly and vertically — no bending, no damage, and no need for vibration assistance.
- Wide compatibility — suitable for 700×300, 600×300, 500×300, and 800×300 H-beam sizes.
- Powerful lifting force — dual-cylinder design with large and small cylinders for both strong pulling and faster operation, providing up to 600 tons of pulling force.
- Time-saving efficiency — several times faster than conventional models.
The client was thrilled:
“Our 320 extractor couldn’t even make it move, but your 360 pulled it out like a carrot! You just saved our schedule!”
Why Can the BeiYi 360 Handle Such a Tough Job So Easily?
The strength of the BY-PM360LS lies in BeiYi’s years of R&D and real-world engineering experience.
If you’re facing a similar challenge, here’s why this machine makes the difference
- 600-Ton Continuous Pulling Force
Dual-cylinder design combined with a 32 MPa ultra-high-pressure hydraulic system ensures long-lasting, stable pulling power without loss of force over time.
- Heavy-Duty Adaptive Clamps
Custom-designed, widened, and thickened clamps ensure a secure grip for large-section H-beams — no slipping, no deformation.
- Works Even in Narrow Spaces
Requires only 70 cm clearance for operation. When space is limited, offset placement or custom setup is also available.
- Wide Application Range
✅ H-beam and steel sheet pile extraction
✅ Port, municipal, subway, and water conservancy projects
✅ Old foundation removal and site clearing
No matter the soil — soft or dense — the BeiYi 360 delivers efficient, reliable pile extraction performance.
If You’re Facing the Same Problem…
Whether it’s a stubborn steel sheet pile, a deeply embedded H-beam, or a critical project delayed by extraction difficulties,
BeiYi Machinery can provide you with:
✅ Free job-site condition assessment
✅ Professional equipment selection guidance
✅ On-site demonstration and technical support
We help you choose the right machine to solve the toughest challenges — quickly, safely, and efficiently.
The BeiYi 360 Pile Extractor is not just about raw power — it represents our commitment to your project’s success.
Contact Us
If you’re struggling with hard-to-remove H-beams or sheet piles, our technical team is on standby 24/7 to offer customized solutions for your job site.